East Kildonan

“I hate the shape of our pool – can we make it look new?” A whole world of opportunities is open to you and you can choose your perfect pool before a jack hammer ever enters your yard. This pool got all the modern upgrades and a whole new life for a young family with a shape change, new coloured patterned stamped concrete decking and walk in stairs.
Need to Replace Your Liner?
Discover our range of liner options! Chat with our team or book a virtual appointment now.

Description

“I hate the shape of our pool – can we make it look new?” A whole world of opportunities is open to you and you can choose your perfect pool before a jack hammer ever enters your yard. This pool got all the modern upgrades and a whole new life for a young family with a shape change, new coloured patterned stamped concrete decking and walk in stairs.

Reviews

There are no reviews yet.

Be the first to review “East Kildonan”

Your email address will not be published. Required fields are marked *

What's included?

New 16g galvanized steel walls.

Even the steel walls of an existing pool can be upgraded and replaced. This client wanted to change the shape of their pool and we reinforced the entire structure with high grade new steel walls, protecting their investment and ensuring the longest time of enjoying their pool.

Stamped and coloured concrete deck on piles

Don't overlook the concrete decking around your pool! There are many ways to amplify the luxury feel of your pool through small detail in your decking. In this project we stamped or added a textured finish to the concrete and colored it to the client's choice.

Coextruded Thermoplastic walk-in step

Previously there was no staircase to this pool. A staircase was added in the direction of the backdoor to create a direct pathway from the home into the pool and back again. Stairs are a great way add an extra area to your pool to sit, rest and relax, or for the little ones to play and splash.

New skimmer and circulation system

When you are renovating your pool, there is never an easier time to upgrade or replace the interior parts that make water what it is. Upgraded to fresh modern technology this client is ensured of lower maintenance costs, greener reduced energy usage and a longer last life of their pool.

Cantilever Concrete coping style

Coping is where the edge of your pool meets the edge of your deck. Nothing will date your pool faster than the white plastic coping that was popular to join pool and decking. For this client we used concrete engineering techniques to bring the concrete decking over the pool edge and create an extremely smooth finish to the touch and to the eye.

Entertaining area

A big party or an intimate conversation, this client was intentional about creating the space. We developed an area around the pool for people to relax and enjoy the backyard pleasure.

New 16g galvanized steel walls pool winnipeg
Stamped and coloured concrete deck on piles pool winnipeg
Coextruded Thermoplastic walk-in step pool winnipeg
New skimmer and circulation system pool winnipeg
Cantilever Concrete coping style pool winnipeg
Entertaining area pool winnipeg
Pool Renovation
Frequently Asked Questions
What time of year is best to change my pool liner?

Great question! Most people like to change their pool liner in the spring as it effects the pool usage least....or so they think! The best time for your pool structure is to replace the pool liner in the heat of the summer when the ground conditions are dry and stable. The process is pretty fast and we can easily accommodate this when your family is at the cottage for a couple days. Other than that, an autumn liner replacement works great for many folks. The great news is that we change pool liners April into October so there is lots of time to get you and your family swimming

How long does a pool liner change take?

There is a lot of steps that go into changing your pool liner. What most people find surprising is that more than half of them occur before we even start to drain the water from your pool. What we find on average is that from the day the existing pool is drained until the day you are able to swim again is about 7 days.

When can you start?

We have 5 pool crews building dreams every day there is no snow. The sooner you click here to book your appointment with our team to discuss options the quicker we can get your pool looking beautiful!

Check Our Available Start Dates
Our team will respond within minutes to let you know our availability and answer any questions you may have. You are 15 seconds away from the pool of your dreams.
Have Questions?
SMS with us
Start the conversation via SMS and connect with us as you go about your day
Visit our showroom
Winnipeg's largest Pool, Bath, Hot Tub and SwimSpa showroom. Come visit, touch and feel the world's greatest backyards.
Send live chat
Chat with one of our online agents now.
Call us
Give us a call now. We're happy to answer your questions.